| |
FASTER
Permanent
Accelerated Construction Solutions (PACS)
projects can be completely built in a fraction of the time it
takes to build using traditional design-bid-build or even design-build
approaches. Recognizing that buildings need not be designed completely
before construction begins, the government has in recent years
utilized design-build strategies to achieve time and cost economies.
Nevertheless, this approach focuses on overlapping construction
with design, not on shrinking the construction timeframe. PACS
takes the construction timeline and significantly shortens it.
It is typical for a Comark PACS building to be completed at least
30% faster and up to 70% faster than site-built or stick-built
projects.
|
|
|